1. Equipment Details
| Project Details | Mushrif pumping station rehabilitation work | ||
| Tag / Equipment ID | OCUAF-01, APF | Location | ML1 |
| Equipment Name | Air purification fan | ||
| Motor Specs | 1.5 kW | 415 V | 2.5 A | ||
2. Electrical & Insulation Checks
| Test Parameter | Measured Value | Result |
|---|---|---|
| Motor Rewinding & Stator Check | REPLACED AND TESTED OK | PASS |
| Winding Resistance (Ohms) | U–V: 3.434 Ω | V–W: 3.366 Ω | W–U: 3.400 Ω | PASS |
| Insulation Resistance (500V DC) – Phase to Ground | 424.75 MΩ (Min: > 5 MΩ) | PASS |
| Insulation Resistance (500V DC) – Phase to Phase | 431.23 MΩ (Min: > 5 MΩ) | PASS |
3. Mechanical Seal & Bearing Replacement
| Component Checked | Replacement Details / Part No. | Result |
|---|---|---|
| Bearings – Drive End (DE) | Part No: 6208 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) | PASS |
| Bearings – Non-Drive End (NDE) | Part No: 6206 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) | PASS |
| Mechanical Seal & Leak Test | N/A (Fan Motor Drive) • Static Leak Test: N/A | PASS |
4. Operational Run Test
| Test Parameter | Measured Value | Result |
|---|---|---|
| Running Current (A) | L1: 0.80 A | L2: 0.82 A | L3: 0.78 A | PASS |
| Bearing Temperature (°C) | DE: 47.5 °C | NDE: 43.2 °C (Normal) | PASS |
| Vibration Level | DE: 1.70 mm/s | NDE: 1.79 mm/s (Smooth) | PASS |
| Rotation & Seal Check | Rotation: Correct (CW) | Seal Leakage: Nil / None | PASS |
5. Sign-Off & Approvals
PREPARED BY:
ENG. JITHU THOMAS
Signature
Date: 31/05/2026
INSPECTED BY:
ASWATH KUMAR HOSDURG
Signature
Date: 31/05/2026
APPROVED BY:
ABU GEROGE
Signature
Date: 31/05/2026