Hydrotek Engineering Co.
Technical Services Division • Workshop Facility
|
|
| Job / WO No: WO-1001-WO101-0001 | Cash No (Maint): 1001 | Ext WO: WO101 | Classification: chargeable |
| Project / Facility | Mishref Station (Ministry of Public Works (MPW)) | ||
| Tag / Equipment ID | PMP-01 | Location | Workshop |
| Equipment Name | Test Booster Pump | ||
| Motor Specs | 415V / 3-Phase | ||
| Bearing & Seal Specs | DE: 6312 2Z/C3 | NDE: 6310 2Z/C3 | Brand: SKF | Seal: Burgmann Cartridge | ||
| Received Date | 22/09/2026 | Delivery Note No | N/A |
| Received Condition | Received at workshop for overhaul inspection. | ||
| Scope of Overhaul | Complete mechanical & electrical overhaul, dynamic balancing, and test bed performance verification. | ||
| Intake Photographs |
|
||
| Status | Task Description | Technician / Assigned | Sign-Off / Date |
|---|---|---|---|
| Initial Electrical Check (Insulation Resistance & Winding Resistance) | Ramesh (Winder) | ||
| Complete Dismantling & Chemical Cleaning of Components | Aswath Kumar (Mechanic) | ||
| Stator Rewinding / Varnish Baking / Core Inspection | Ramesh (Winder) | ||
| Shaft Runout Measurement & Bearing Journals Inspection | Aswath Kumar (Mechanic) | ||
| Impeller Dynamic Balancing (ISO 1940 Grade G2.5) | Balancing Specialist | ||
| Installation of New SKF Bearings & Mechanical Seal | Aswath Kumar (Mechanic) | ||
| Hydrostatic Pressure Shell Test (1.5x Design Pressure) | Senior QA Tech | ||
| Final Test Bed Operational Run (Current, Vibration, Temp) | ENG. JITHU THOMAS |
|
WORK COMPLETED BY:
ASWATH KUMAR HOSDURG
Signature & Date
|
TEST BED INSPECTED BY:
ENG. JITHU THOMAS
Signature & Date
|
WORKSHOP APPROVAL:
ABU GEROGE
Signature & Date
|
|
Intake Condition Photographs (2)
|
Work Completion Photographs (1)
|
| Hydrotek Engineering Co. • Technical Services Division • Workshop Overhaul Card | REF: WO-1001-WO101-0001 • CASH: 1001 |