Job No: HY-TSD-TR-2026-0567 PASS

OCF 01 • Odur control extract fan motor

Hydrotek Engineering Co.

Hydrotek Engineering Co.

Technical Services Division

Technical Services Division
EQUIPMENT OVERHAUL & TEST REPORT
Job No: HY-TSD-TR-2026-0567
Date:
Overall Result: PASS
1. Equipment Details
Project Details Mushrif pumping station rehabilitation work
Tag / Equipment ID OCF 01 Location ML-1
Equipment Name Odur control extract fan motor
Motor Specs 160 kW | 415 V | 261.9 A
2. Electrical & Insulation Checks
Test Parameter Measured Value Result
Motor Rewinding & Stator Check Rewinded & Tested OK PASS
Winding Resistance (Ohms) U1–U2: 0.121 Ω | V1–V2: 0.119 Ω | W1–W2: 0.120 Ω PASS
Insulation Resistance (500V DC) – Phase to Ground U–G: 436.38 MΩ | V–G: 442.15 MΩ | W–G: 421.90 MΩ PASS
Insulation Resistance (500V DC) – Phase to Phase U–V: 483.03 MΩ | V–W: 487.00 MΩ | W–U: 471.37 MΩ PASS
3. Mechanical Seal & Bearing Replacement
Component Checked Replacement Details / Part No. Result
Bearings – Drive End (DE) Part No: 6316 C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Bearings – Non-Drive End (NDE) Part No: 6314 C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Mechanical Seal & Leak Test N/A (Fan Motor Drive) • Static Leak Test: N/A PASS
4. Operational Run Test
Test Parameter Measured Value Result
Running Current (A) L1: 91.30 A | L2: 93.13 A | L3: 89.47 A PASS
Bearing Temperature (°C) DE: 44.5 °C | NDE: 48.2 °C (Normal) PASS
Vibration Level DE: 1.80 mm/s | NDE: 1.80 mm/s (Smooth) PASS
Rotation & Seal Check Rotation: Correct (CW) | Seal Leakage: Nil / None PASS
5. Sign-Off & Approvals
PREPARED BY:
ENG. JITHU THOMAS
Signature Date: 21/05/2026
INSPECTED BY:
ASWATH KUMAR HOSDURG
Signature Date: 21/05/2026
APPROVED BY:
ABU GEROGE
Signature Date: 21/05/2026
Hydrotek Engineering Co. • Equipment Overhaul & Test Certificate
REF: HY-TSD-TR-2026-0567 • PAGE 1 OF 1