Job No: HY-TSD-TR-2026-0580 PASS

CT 04 • Chemical Mixer

Hydrotek Engineering Co.

Hydrotek Engineering Co.

Technical Services Division

Technical Services Division
EQUIPMENT OVERHAUL & TEST REPORT
Job No: HY-TSD-TR-2026-0580
Date:
Overall Result: PASS
1. Equipment Details
Project Details Mushrif pumping station rehabilitation work
Tag / Equipment ID CT 04 Location ML-1
Equipment Name Chemical Mixer
Motor Specs 0.75 kW | 415 V | 1.2 A
2. Electrical & Insulation Checks
Test Parameter Measured Value Result
Motor Rewinding & Stator Check Rewinded & Tested OK PASS
Winding Resistance (Ohms) U1–U2: 3.434 Ω | V1–V2: 3.366 Ω | W1–W2: 3.400 Ω PASS
Insulation Resistance (500V DC) – Phase to Ground U–G: 418.18 MΩ | V–G: 432.20 MΩ | W–G: 404.53 MΩ PASS
Insulation Resistance (500V DC) – Phase to Phase U–V: 415.63 MΩ | V–W: 430.33 MΩ | W–U: 409.61 MΩ PASS
3. Mechanical Seal & Bearing Replacement
Component Checked Replacement Details / Part No. Result
Bearings – Drive End (DE) Part No: 6208 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Bearings – Non-Drive End (NDE) Part No: 6206 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Mechanical Seal & Leak Test N/A (Fan Motor Drive) • Static Leak Test: N/A PASS
4. Operational Run Test
Test Parameter Measured Value Result
Running Current (A) L1: 0.40 A | L2: 0.41 A | L3: 0.39 A PASS
Bearing Temperature (°C) DE: 50.5 °C | NDE: 48.2 °C (Normal) PASS
Vibration Level DE: 2.00 mm/s | NDE: 2.10 mm/s (Smooth) PASS
Rotation & Seal Check Rotation: Correct (CW) | Seal Leakage: Nil / None PASS
5. Sign-Off & Approvals
PREPARED BY:
ENG. JITHU THOMAS
Signature Date: 04/05/2026
INSPECTED BY:
ASWATH KUMAR HOSDURG
Signature Date: 04/05/2026
APPROVED BY:
ABU GEROGE
Signature Date: 04/05/2026
Hydrotek Engineering Co. • Equipment Overhaul & Test Certificate
REF: HY-TSD-TR-2026-0580 • PAGE 1 OF 1