Job No: HY-TSD-TR-2026-0612 PASS

SP 4 • Sump pump Flygt 3057.181

Hydrotek Engineering Co.

Hydrotek Engineering Co.

Technical Services Division

Technical Services Division
EQUIPMENT OVERHAUL & TEST REPORT
Job No: HY-TSD-TR-2026-0612
Date: 09/05/2026
Overall Result: PASS
1. Equipment Details
Project Details Mushrif pumping station rehabilitation work
Tag / Equipment ID SP 4 Location LL
Equipment Name Sump pump Flygt 3057.181
Motor Specs 1.7 kW | 415 V | 2.8 A
Pump Specs Model: Flygt Submersible / KSB
2. Electrical & Insulation Checks
Test Parameter Measured Value Result
Motor Rewinding & Stator Check Rewinded & Tested OK PASS
Winding Resistance (Ohms) U1–U2: 3.434 Ω | V1–V2: 3.366 Ω | W1–W2: 3.400 Ω PASS
Insulation Resistance (500V DC) – Phase to Ground U–G: 439.68 MΩ | V–G: 443.89 MΩ | W–G: 425.84 MΩ PASS
Insulation Resistance (500V DC) – Phase to Phase U–V: 446.34 MΩ | V–W: 458.66 MΩ | W–U: 439.95 MΩ PASS
3. Mechanical Seal & Bearing Replacement
Component Checked Replacement Details / Part No. Result
Bearings – Drive End (DE) Part No: 6208 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Bearings – Non-Drive End (NDE) Part No: 6206 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Mechanical Seal & Leak Test Burgmann MG1 / 45mm SiC/SiC/Viton • Static Leak Test: Pass PASS
4. Operational Run Test
Test Parameter Measured Value Result
Running Current (A) L1: 1.00 A | L2: 1.02 A | L3: 0.98 A PASS
Bearing Temperature (°C) DE: 51.5 °C | NDE: 41.2 °C (Normal) PASS
Vibration Level DE: 2.20 mm/s | NDE: 2.31 mm/s (Smooth) PASS
Rotation & Seal Check Rotation: Correct (CW) | Seal Leakage: Nil / None PASS
5. Sign-Off & Approvals
PREPARED BY:
ENG. JITHU THOMAS
Signature Date: 09/05/2026
INSPECTED BY:
ASWATH KUMAR HOSDURG
Signature Date: 09/05/2026
APPROVED BY:
ABU GEROGE
Signature Date: 09/05/2026
Hydrotek Engineering Co. • Equipment Overhaul & Test Certificate
REF: HY-TSD-TR-2026-0612 • PAGE 1 OF 1