Job No: HY-TSD-TR-2026-0628 PASS

NA • Sump pump

Hydrotek Engineering Co.

Hydrotek Engineering Co.

Technical Services Division

Technical Services Division
EQUIPMENT OVERHAUL & TEST REPORT
Job No: HY-TSD-TR-2026-0628
Date: 11/05/2026
Overall Result: PASS
1. Equipment Details
Project Details Mushrif pumping station rehabilitation work
Tag / Equipment ID NA Location NA
Equipment Name Sump pump
Motor Specs 23.7 kW | 415 V | 38.8 A
Pump Specs Model: Flygt Submersible / KSB
2. Electrical & Insulation Checks
Test Parameter Measured Value Result
Motor Rewinding & Stator Check Rewinded & Tested OK PASS
Winding Resistance (Ohms) U1–U2: 0.848 Ω | V1–V2: 0.832 Ω | W1–W2: 0.840 Ω PASS
Insulation Resistance (500V DC) – Phase to Ground U–G: 455.19 MΩ | V–G: 458.86 MΩ | W–G: 443.06 MΩ PASS
Insulation Resistance (500V DC) – Phase to Phase U–V: 447.52 MΩ | V–W: 454.20 MΩ | W–U: 440.50 MΩ PASS
3. Mechanical Seal & Bearing Replacement
Component Checked Replacement Details / Part No. Result
Bearings – Drive End (DE) Part No: 6312 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Bearings – Non-Drive End (NDE) Part No: 6310 2Z/C3 • Brand: SKF (Explorer Series) (Replaced New) PASS
Mechanical Seal & Leak Test Burgmann MG1 / 45mm SiC/SiC/Viton • Static Leak Test: Pass PASS
4. Operational Run Test
Test Parameter Measured Value Result
Running Current (A) L1: 13.50 A | L2: 13.77 A | L3: 13.23 A PASS
Bearing Temperature (°C) DE: 45.5 °C | NDE: 44.2 °C (Normal) PASS
Vibration Level DE: 1.90 mm/s | NDE: 2.00 mm/s (Smooth) PASS
Rotation & Seal Check Rotation: Correct (CW) | Seal Leakage: Nil / None PASS
5. Sign-Off & Approvals
PREPARED BY:
ENG. JITHU THOMAS
Signature Date: 11/05/2026
INSPECTED BY:
ASWATH KUMAR HOSDURG
Signature Date: 11/05/2026
APPROVED BY:
ABU GEROGE
Signature Date: 11/05/2026
Hydrotek Engineering Co. • Equipment Overhaul & Test Certificate
REF: HY-TSD-TR-2026-0628 • PAGE 1 OF 1