← Back to All Projects / Mishref Station
active

Mishref Station

Client: Ministry of Public Works (MPW)

Equipment & Pump Overhaul Schedule

Total of 4 pumps registered for this project

Tag / ID Pump Details & Type Electrical Specs Hydraulic Specs Mechanical / Bearings Status Certificate & Actions
PUMP Fresh water pumps (1,2,3)
Vertical Multistage In-Line Booster Pump
Vertical Multistage In-Line Booster Pump
Job: Stage Chamber Reconditioning, Impeller Stack Overhaul & Hydrostatic Pressure Test
Lowara • SV6002F55T
5.5 kW
415 V • 13.00 A
2900 RPM
Flow: 72 m³/hr
Head: 33 M
DE: 6308
NDE: 6308
Cartridge Balanced Mechanical Seal (EPDM)
TESTED / PASS
PUMP SV9203/2F185T
Vertical Multistage In-Line Booster Pump
Vertical Multistage In-Line Booster Pump
Job: Stage Chamber Reconditioning, Impeller Stack Overhaul & Hydrostatic Pressure Test
LOWARA • SV9203/2F185T
18.5 kW (25 HP)
415 V • 30.30 A
2900 RPM
Flow: 120 m³/hr
Head: 120 m
DE: 6308
NDE: 6308
Cartridge Balanced Mechanical Seal (EPDM)
TESTED / PASS
PUMP SV805F22T/A
Vertical Multistage In-Line Booster Pump
Vertical Multistage In-Line Booster Pump
Job: Stage Chamber Reconditioning, Impeller Stack Overhaul & Hydrostatic Pressure Test
Lowara • SV805F22T/A
2.2 kW (3 HP)
415 V • 4.60 A
2900 RPM
Flow: 14 m³/hr
Head: 62 m
DE: 6308
NDE: 6308
Cartridge Balanced Mechanical Seal (EPDM)
TESTED / PASS
PUMP SV404F07T/2
Vertical Multistage In-Line Booster Pump
Vertical Multistage In-Line Booster Pump
Job: Stage Chamber Reconditioning, Impeller Stack Overhaul & Hydrostatic Pressure Test
LOWARA • SV404F07T/2
0.7 kW (1 HP)
415 V • 1.70 A
2900 RPM
Flow: 8 m³/hr
Head: 34 m
DE: 6203
NDE: 6202
Cartridge Balanced Mechanical Seal (EPDM)
TESTED / PASS