BOOSTER PUMP OVERHAUL & TEST REPORT
Job / WO No:
HY-TSD-TR-2026-0640
Report No:
HY-TSD-TR-2026-0640
Date:
Result:
ACCEPTED
1. Equipment Details
| Project Details | Mishref Station (Ministry of Public Works (MPW)) | ||
| Tag / Equipment ID | SV404F07T/2 | Location | Main Building - Roof |
| Equipment Name | Vertical Multistage In-Line Booster Pump (Vertical Multistage In-Line Booster Pump) | ||
| Motor Specs | 0.7 kW (1 HP) | 415 V | 1.70 A | 2900 RPM RPM | ||
| Pump Specs | Model: LOWARA SV404F07T/2 | Flow: 8 m³/hr | Head: 34 m m | ||
| Booster Specs | Suction: 1.00 Bar | Discharge: 3.40 Bar | Boost Head: 25.00 m | Stages: 4 | Hydro Test: 3.40 Bar | ||
2. 1. ELECTRICAL & STATOR INSULATION TEST
| Test Parameter | Measured Value | Result |
|---|---|---|
| Stator Condition / Winding Status | Overhauled, Serviced & Tested OK | PASS |
| Winding Resistance (U1-U2, V1-V2, W1-W2 in Ohms) | U1–U2: 15.236 Ω | V1–V2: 15.205 Ω | W1–W2: 14.998 Ω | PASS |
| Insulation Resistance (500V DC) – Phase to Ground | U–G: 439.95 MΩ | V–G: 449.51 MΩ | W–G: 433.67 MΩ | PASS |
| Insulation Resistance (500V DC) – Phase to Phase | U–V: 434.70 MΩ | V–W: 443.30 MΩ | W–U: 421.50 MΩ | PASS |
3. 2. MECHANICAL SPECIFICATIONS & RENEWALS
| Component Checked | Replacement Details / Part No. | Result |
|---|---|---|
| Drive End (DE) Bearing Fitted | Part No: 6203 • Brand: SKF (Replaced New) | PASS |
| Non-Drive End (NDE) Bearing Fitted | Part No: 6202 • Brand: SKF (Replaced New) | PASS |
| Mechanical Seal / Seal Spec | Cartridge Balanced Mechanical Seal (EPDM) • Static Leak Test: PASS | PASS |
4. 3. HYDRAULIC & HYDROSTATIC PRESSURE TESTING
| Test Parameter | Measured Value / Verification | Result |
|---|---|---|
| Hydraulic Pressure Boost Head | Suction: 1.00 Bar • Discharge: 3.40 Bar • Boost Head: 25.00 m • Stages: 4 | PASS |
| Hydrostatic Pressure Hold Test | Pressure: 3.40 Bar • Duration: 30 mins • Integrity: PASS - Zero Leakage | PASS |
| Pressure Controls & Transducer | Cut-In: 2 Bar • Cut-Out: 3.4 Bar | PASS |
5. 4. OPERATIONAL RUN TEST (NO-LOAD / FULL SYSTEM RUN)
| Test Parameter | Measured Value | Result |
|---|---|---|
| Running Current (A) | L1: 0.6 A | L2: 0.6 A | L3: 0.6 A | PASS |
| Bearing Temperature (°C) | DE: 48.5 °C | NDE: 43.2 °C (Normal) | PASS |
| Vibration Level | DE: 1.55 mm/s | NDE: 1.68 mm/s (Smooth) | PASS |
| Rotation & Seal Check | Rotation: Correct (CW) | Seal Leakage: Nil / None | PASS |
6. 5. SPECIALIZED WORKSHOP VERIFICATIONS
| Test Name | Standard / Criteria | Measured / Inspection | Result |
|---|---|---|---|
| Hydrostatic Pressure Shell Test | 1.5x Design Pressure (15 mins) | No leakage or drop observed | PASS |
| Control Panel & PLC | - | Calibrated and No Fluctuation found | PASS |
| Pressure Tank 200ltr 10 bar | - | No leakage or drop observed | PASS |
7. Sign-Off & Approvals
TESTED & OVERHAULED BY
ENG. JITHU THOMAS
Signature
Date: 23/09/2026
QA / QC ENGINEER
ASWATH KUMAR HOSDURG
Signature
Date: 23/09/2026
HEAD OF DIVISION / WORKSHOP MANAGER
ABU GEROGE
Signature
Date: 23/09/2026
Hydrotek Engineering Co. • Custom Equipment Overhaul & Test Certificate
REF: HY-TSD-TR-2026-0640 • PAGE 1 OF 1
Equipment Photographic Documentation & Overhaul Audit 0 photo(s)
Visual proof of equipment condition: Intake / Before Overhaul vs. Completed / After Overhaul.
1. Intake / Before Overhaul Condition
0 photosPhotographs taken upon arrival (nameplate, casing, impeller wear, physical damage).
No intake condition photographs uploaded yet.
2. Completed / Post-Overhaul Condition
0 photosPhotographs taken after reassembly, painting, rewinding, new bearings & test run.
No completion photographs uploaded yet.