Job No: HY-TSD-TR-2026-0634 ACCEPTED

WEG-22kW • WEG motor • Kabd Water Treatment Plant - Pump & Motor Repair overhauling

Hydrotek Engineering Co.

Hydrotek Engineering Co.

Technical Services Division

Technical Services Division
ELECTRIC MOTOR OVERHAUL & TEST CERTIFICATE
Job / WO No: HY-TSD-TR-2026-0634
Report No: HY-TSD-TR-2026-0634
Date:
Result: ACCEPTED
1. Equipment Details
Project Details Kabd Water Treatment Plant - Pump & Motor Repair overhauling (M/s. Contractor Co.)
Tag / Equipment ID WEG-22kW Location Kabd Water Treatment Plant
Equipment Name WEG motor (TEFC Squirrel Cage Induction Motor)
Motor Specs 22kW | 415 V | 40.00 A | 2900 RPM RPM
Pump Specs Model: WEG
2. 1. ELECTRICAL & STATOR INSULATION TEST
Test Parameter Measured Value Result
Stator Condition / Winding Status Overhauled, Serviced & Tested OK PASS
Winding Resistance (U1-U2, V1-V2, W1-W2 in Ohms) U1–U2: 0.848 Ω | V1–V2: 0.832 Ω | W1–W2: 0.840 Ω PASS
Insulation Resistance (500V DC) – Phase to Ground U–G: 426.92 MΩ | V–G: 434.78 MΩ | W–G: 421.95 MΩ PASS
Insulation Resistance (500V DC) – Phase to Phase U–V: 473.54 MΩ | V–W: 478.82 MΩ | W–U: 464.23 MΩ PASS
3. 2. MECHANICAL SPECIFICATIONS & RENEWALS
Component Checked Replacement Details / Part No. Result
Drive End (DE) Bearing Fitted Part No: 6312 2Z/C3 • Brand: SKF (Replaced New) PASS
Non-Drive End (NDE) Bearing Fitted Part No: 6310 2Z/C3 • Brand: SKF (Replaced New) PASS
Mechanical Seal / Seal Spec Burgmann Cartridge Mechanical Seal • Static Leak Test: N/A PASS
4. 4. OPERATIONAL RUN TEST (NO-LOAD / FULL SYSTEM RUN)
Test Parameter Measured Value Result
Running Current (A) L1: 40 A | L2: 40.5 A | L3: 39.9 A PASS
Bearing Temperature (°C) DE: 48.5 °C | NDE: 43.2 °C (Normal) PASS
Vibration Level DE: 1.55 mm/s | NDE: 1.68 mm/s (Smooth) PASS
Rotation & Seal Check Rotation: Correct (CW) | Seal Leakage: Nil / None PASS
5. 5. SPECIALIZED WORKSHOP VERIFICATIONS
Test Name Standard / Criteria Measured / Inspection Result
Motor Insulation Test 500W DC Meggar Test No earth Leakage found PASS
Painting Done - OK PASS
6. Sign-Off & Approvals
PREPARED BY:
ENG. JITHU THOMAS
Signature Date: 07/05/2026
INSPECTED BY:
ASWATH KUMAR HOSDURG
Signature Date: 07/05/2026
APPROVED BY:
ABU GEROGE
Signature Date: 07/05/2026
Hydrotek Engineering Co. • Custom Equipment Overhaul & Test Certificate
REF: HY-TSD-TR-2026-0634 • PAGE 1 OF 1

Equipment Photographic Documentation & Overhaul Audit 0 photo(s)

Visual proof of equipment condition: Intake / Before Overhaul vs. Completed / After Overhaul.

1. Intake / Before Overhaul Condition

0 photos

Photographs taken upon arrival (nameplate, casing, impeller wear, physical damage).

No intake condition photographs uploaded yet.

2. Completed / Post-Overhaul Condition

0 photos

Photographs taken after reassembly, painting, rewinding, new bearings & test run.

No completion photographs uploaded yet.